[1]. Sarica C., Shoham O. and Brill J. P., “A New approach for finger storage slug catcher design,” This paper was presented at the 22nd Annual OTC in Houston, Texas, May 7-10, 1990.##
[2]. Taitel, Y. and Dukler A. E., “A model for predicting flow regime transition in horizobtal and near horizontal gas – liquid flow,” AIChE Journal, Vol. 22, Issue 1, pp. 47–55, January 1976.##
[3]. Faluomi V., Sodini S. and Di Benga C., “Optimization of finger type slug catcher design through rigorous transient multiphase flow analysis,” Offshore Mediterranean Conference and Exhibition in Ravenna, Italy, March 20-22, 2013.##
[4]. Faluomi V., Dellarole S., Sodini S., Bonuccelli M. and Fratini M., “Oil/Gas field feasibility evaluation: a fast running tool for flow assurance analyses,” OMC 2011, Ravenna, March 2011.##
[5]. Kalat H. R., Khomarloo P. and Assa K., “A new approach for sizing finger-type slug catcher,” Gas Processing, MAY/JUNE 2015.##
[6]. Bonuccelli M., Mazzoni A., Aprile G., Ghiselli P. W. and Granato M., “Guidelines for design deep water multiphase transportation system,” Offshore Mediterranean Conference OMC 1999, Ravenna, 24-26 March, 1999.##
[7]. Shell, “Design of Multiple-Pipe Slug Catchers,” 1998.##
[8]. Kimmitt R. P., Root C. R. and Rhinesmith R. B., “Proven methods for design and operation of gas plant liquid slug catching equipment,” 78th Annual Convention and in Various Regional GPA Forums, 2001.##
[9]. Brill J. P. and Beggs H. D., “Two phase flow in pipes,” 6th Edition, 1991.##
[10]. Guzhov A. L., Mamayev V. A. and Odishariya G. E., “A study of transportation in gas liquid systems,” 10th International Gas Union Conference Hamburg, Germany, June 6-10,1967.##
[11]. Arnold K., “Surface Production Operartion,” Second Edition, 1999.##
[12]. American Petroleum Institute, “Specification for oil and gas separators,” API Spec 12J, 1989.##
[13]. Petronas Technical Standards, “Guidelines for hydraulic design of multipipe pipe slug catchers,” 1984.##
[14]. Haavardsson N. F., “Hydrocarbon production optimization in multi-reservoir fields – tools for enhanced value chain analysis”, Philosophiae Doctor thesis, Department of Mathematics, University of Oslo, 2008.##
[15]. NIOC, Eni Group, Petropars Ltd, “Process specification for slug catcher, Iran– South Pars Gas Field,” SPP 2017 100 X 101, 2001.##
[16]. Bhran A., Hassanean M. H. and Helal M., “Maximization of natural gas liquids production from an existing gas plant,” Elsevier, 2015.##
[18]. American National Standards institute, “Welded and seamless wrought steel pipe,” ASME/ANSI B36.10M, 2004.##
[19]. Iranian Petroleum Standards, “Engineering standard for Piping Material Selection,” IPS-E-PI-221, 2012.##
[20]. ArcelorMittal, “Pipe Schedules (according to ASME/ANSI B36.10M),” Projects Oil and Gas, 2006.##