[1]. Yang, S., Li, Z., Yan, K., Zhang, X., Xu, Z., Liu, W., ... & Liu, H. (2021). Removing and recycling mercury from scrubbing solution produced in wet nonferrous metal smelting flue gas purification process. Journal of Environmental Sciences, 103, 59-68. https://doi.org/10.1016/j.jes.2020.10.013.##
[2]. Bai, B., Guo, Z., Zhou, C., Zhang, W., & Zhang, J. (2021). Application of adaptive reliability importance sampling-based extended domain PSO on single mode failure in reliability engineering. Information Sciences, 546, 42-59. https://doi.org/10.1016/j.ins.2020.07.069##
[3]. خاکنژاد، س. و ابراهیمزاده رجایی، غ. ر. (1399). ،بررسی نقاط قوت و ضعف روشهای ازدیاد برداشت نفت، کنفرانس ملی مهندسی شیمی و نانوفنآوری، دزفول. ##
[4]. کیارسیحیدر، پ.، رادفر، ر.، البرزی، م. و طلوعی اشلقی، ع. (1397). تدوین نقشه راه فنآوریهای ازدیاد برداشت نفت: رویکرد پویایی سیستمی. پژوهشهای سیاستگذاری و برنامهریزی انرژی، 4(13)، 122-89. ##
[5]. Rozhkova, Y. A., Burin, D. A., Galkin, S. V., & Yang, H. (2022). Review of microgels for enhanced oil recovery: Properties and cases of application. Gels, 8(2), 112. doi.org/10.3390/gels8020112. ##
[6]. قربانی، ه.، مقدسی، ج. و قربانی، ه. (1395). ارزیابی عملکرد روشهای ازدیاد برداشت نفت و ارائه راهکار متناسب با مخازن نفتی ایران، ششمین همایش علمی مهندسی مخازن هیدروکربوری و صنایع بالادستی، تهران. ##
[7]. Vora, M., Sanni, S., & Flage, R. (2021). An environmental risk assessment framework for enhanced oil recovery solutions from offshore oil and gas industry. Environmental Impact Assessment Review, 88, 106512. doi.org/10.1016/j.eiar.2020.106512. ##
[8]. Shaktawat, A., & Vadhera, S. (2020). Risk management of hydropower projects for sustainable development: a review. Environment, Development and Sustainability, 1-32. doi.org/10.1007/s10668-020-00607-2. ##
[9]. Burggräf, P., Adlon, T., Schupp, S., & Salzwedel, J. (2021). Risk Management in Factory Planning–A Literature Review. Procedia CIRP, 104, 1191-1196. doi.org/10.1016/j.procir.2021.11.200. ##
[10]. Buganová, K., & Šimíčková, J. (2019). Risk management in traditional and agile project management. ##
[11]. Odimabo, O., & Oduoza, C. F. (2018). Guidelines to aid project managers in conceptualizing and implementing risk management in building projects. Procedia Manufacturing, 17, 515-522. doi.org/10.1016/j.promfg.2018.10.091. ##
[12]. Szymański, P. (2017). Risk management in construction projects. Procedia Engineering, 208, 174-182. doi.org/10.1016/j.proeng.2017.11.036. ##
[13]. Pan, X., & Wang, Y. (2021). Evaluation of renewable energy sources in China using an interval type-2 fuzzy large-scale group risk evaluation method. Applied Soft Computing, 108, 107458. doi.org/10.1016/j.asoc.2021.107458. ##
[14]. Pirizadeh, M., Alemohammad, N., Manthouri, M., & Pirizadeh, M. (2023). A new approach for ranking enhanced oil recovery methods based on multi-gene genetic programming. Petroleum Science and Technology, 41(1), 64-85. doi.org/10.1080/10916466.2022.2030752. ##
[15]. Wei, Z., Zhu, S., Dai, X., Wang, X., Yapanto, L. M., & Raupov, I. R. (2021). Multi-criteria decision making approaches to select appropriate enhanced oil recovery techniques in petroleum industries. Energy Reports, 7, 2751-2758. https://doi.org/10.1016/j.egyr.2021.05.002. ##
[16] Bealessio, B. A., Alonso, N. A. B., Mendes, N. J., Sande, A. V., & Hascakir, B. (2021). A review of enhanced oil recovery (EOR) methods applied in Kazakhstan. Petroleum, 7(1), 1-9. doi.org/10.1016/j.petlm.2020.03.003. ##
[17]. Preux, C., Lamoureux-Var, V., Ayache, S. V., & Michel, P. (2018). Forecasting H2S Production Risk in Thermal Projects for EOR. In First EAGE/IFPEN Conference on Sulfur Risk Management in Exploration and Production (pp. cp-565). EAGE Publications BV. dx.doi.org/10.3997/2214-4609.201802770. ##
[18]. Jia, W., Pan, F., Dai, Z., Xiao, T., & McPherson, B. (2017). Probabilistic risk assessment of CO2 trapping mechanisms in a sandstone CO2-EOR field in northern texas, USA. Energy Procedia, 114, 4321-4329. doi.org/10.1016/j.egypro.2017.03.1581. ##
[19]. Hartono, A.D., Hakiki, F., Syihab, Z., Ambia, F., Yasutra, A., Sutopo, S., Efendi, M., Sitompul, V., Primasari, I. and Apriandi, R. (2017). Revisiting EOR projects in indonesia through integrated study: EOR screening, predictive model, and optimisation. In SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition. OnePetro. dx.doi.org/10.2118/186884-MS. ##
[20]. Nazarian, B., & Ringrose, P. (2017). Risk Associated with Legacy Wells in CCS and CO2 EOR Projects; a Simulation Study. In 79th EAGE Conference and Exhibition, 2017(1). 1-5. EAGE Publications BV. dx.doi.org/10.3997/2214-4609.201700759. ##
[21]. Suleimanov, B. A., Ismayilov, F. S., Dyshin, O. A., & Veliyev, E. F. (2016). Selection methodology for screening evaluation of EOR methods. Petroleum Science and Technology, 34(10), 961-970. dx.doi.org/10.1080/10916466.2015.1107849. ##
[22]. قجاوند، ح. و شفیعی، م. ا. (1399). ارائه مدل افزایش بهرهوری مراکز ازدیاد برداشت از مخازن نفت و گاز کشور با انتخاب شرکای فنآور مناسب خارجی جهت توسعه زنجیره ارزش. نشریه پژوهش نفت، 30(110)، 144-131 .doi.org/10.22078/pr.2018.3263.2505. ##
[23]. بلیلهوند، ح. ر.، دشتی، ن.، خراط، ر. و جباری، ن. (1397). بررسی عملکرد شبکههای عصبی مصنوعی (ANN) در انتخاب هوشمند روشهای ازدیاد برداشت نفت، پنجمین کنفرانس بینالمللی فنآوری و مدیریت انرژی با رویکرد پیوند انرژی، آب و محیط زیست، تهران. ##
[24]. دباغی، آ.، ابراهیمزاده رجائی، ش.، پروازدوانی، م. و گرامی، ش. (1403). رویکردی جامع برای ارزیابی و اولویتبندی ریسکهای ازدیادبرداشت: مطالعه موردی ازدیاد برداشت آبپایه در یکی از میادین نفتی جنوب غربی ایران. پژوهش نفت. .doi.org/10.22078/pr.2024.5307.3356. ##
[25]. خیرالهی، ح.، زایدی، م.، سبحانی، ص.، چهاردولی، م.، و سیمجو، م. (1402). غربالگری روشهای ازدیاد برداشت از مخازن نفتی با استفاده از تلفیق روشهای هوشمصنوعی. پژوهش نفت، 33(5)، 62-51. doi.org/10.22078/pr.2023.5151.3284##
[26]. García-Crespo, Á., Colomo-Palacios, R., Soto-Acosta, P., & Ruano-Mayoral, M. (2010). A qualitative study of hard decision making in managing global software development teams. Information Systems Management, 27(3), 247-252. doi.org/10.1080/10580530.2010.493839. ##
[27]. Ko, W. C. (2013). Exploiting 2-tuple linguistic representational model for constructing HOQ-based failure modes and effects analysis. Computers & Industrial Engineering, 64(3), 858-865. doi.org/10.1016/j.cie.2012.11.016. ##
[28]. Liu, H. C., Liu, L., Liu, N., & Mao, L. X. (2012). Risk evaluation in failure mode and effects analysis with extended VIKOR method under fuzzy environment. Expert Systems with Applications, 39(17), 12926-12934. doi.org/10.1016/j.eswa.2012.05.031.
[29]. Haktanir, E., & Kahraman, C. (2021). A Novel CRITIC Based Weighted FMEA Method: Application to COVID-19 Blood Testing Process. Journal of Multiple-Valued Logic & Soft Computing, 37. ##
[30]. Mentes, A., & Helvacioglu, I. H. (2011). Review of Fuzzy Set Theory Applications in Safety Assessment for Marine and Offshore Industries. In ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering (pp. 875-884). American Society of Mechanical Engineers. dx.doi.org/10.1115/OMAE2011-50244. ##
[31]. Kumru, M., & Kumru, P. Y. (2013). Fuzzy FMEA application to improve purchasing process in a public hospital. Applied Soft Computing, 13(1), 721-733. doi.org/10.1016/j.asoc.2012.08.007. ##
[32]. Bowles, J. B., & Peláez, C. E. (1995). Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis. Reliability Engineering & System Safety, 50(2), 203-213. doi.org/10.1016/0951-8320(95)00068-D. ##